Eastern Metal Supply: Bertha HV Essential Accordion Shutter Performance Evaluation

Store Home

Eastern Metal Supply: Bertha HV Essential Accordion Shutter Performance Evaluation

$150.00$200.00 or ( 15 Tokens - 20 Tokens )

This certification applies to various installation conditions for the Eastern Metal Supply: Bertha HV Essential Accordion Shutter Performance Evaluation Report. This document has been designed to meet the requirements of the current Building Code and, upon ordering, will be signed and sealed by a Professional Engineer of the firm.

It is sold as an engineered sealed document and meets the requirements of the applicable building code using ASCE 7 to approve structural adequacy only. Use it with your other approved documents to obtain a building permit. It is generic, and installations beyond the scope and limitations of this document shall require site-specific engineering. (Former Plan #20-31289.2)

For site-specific projects, click here to request a quote (contractors & manufacturers only, no homeowners for site-specific work).

Read More
Please select the state you would like the document certified in
This field can't be Empty
This field can't be Empty
This field can't be Empty
Save up to an additional 33% by using tokens Learn more

Product Documents

Product Documents

Weight .48 lbs
Dimensions .1 × 11 × 17 in
Plan Format

Digitally Sealed Online-Only File, Raised Sealed Physical Copy

Plan Type

Manufacturer Plans, Performance Evaluation Report

Material

Aluminum

Brand

Eastern Metal Supply

Plan Designer

Engineering Express

Storefront

Eastern Metal Supply, Engineering Express

The document you are purchasing is a generic performance evaluation. Use of this document for any site-specific application is the responsibility of others. Installations beyond the performance limitations listed within the purchased document, any site-specific designs/certifications, or California-specific projects shall require custom engineering and invalidate the use of this evaluation. Learn more about the use of this document

Click here to request a quote for us to provide these services, which can also be provided by others who would then become responsible for the applicability of this evaluation. Contact Us if there are any questions and always consult with a design professional before using any generic performance evaluations with your project.
Please sign in or create a free account
to use Favorites
The Building Products Circle

Read, ask experts, & comment on this topic. All for free.

Latest Posts

Ask The Circle
Scroll to Top