About Plan Store, Calculators & Membership Services

FAQ Is the 7th Edition Florida Building Code still valid? That’s what it says on my plan.

If the controlling permit for your project is dated prior to Jan 1, 2024, then the  7th Edition Florida Building Code is still valid.  Otherwise, you will need to place an order for an updated version of the plan (please visit EngineeringExpress.com/store/ to start your search (We recommend beginning with the brand needed if known …

FAQ Is the 7th Edition Florida Building Code still valid? That’s what it says on my plan. Read More »

FAQ The building department is asking for design wind speed – risk category – exposure – address on my plan – performance evaluation – TER What do I tell them?

In the case of Performance Evaluation Plans and Technical Evaluation Reports, product evaluations, master plans, and technical evaluation reports generally list the limiting pressure forces that the product (building component) can withstand  (such as these – click here). Items such as wind speed, risk category, wind exposure are connected to the site-specific condition the building …

FAQ The building department is asking for design wind speed – risk category – exposure – address on my plan – performance evaluation – TER What do I tell them? Read More »

How To Use Performance Evaluations – TER’s – Calculator Reports Purchased From Engineering Express

READ BELOW BEFORE USING NON SITE-SPECIFIC PERFORMANCE EVALUATIONSFROM ENGINEERING EXPRESS FOR YOUR PROJECT General Information About Non Site-Specific Plans: Certified Performance Evaluations (also referred to as Master Plans, Generic, or Non Site-Specific Plans) you receive contain a physical or digitally certified engineer seal. They are intended to be used to assist in obtaining a building …

How To Use Performance Evaluations – TER’s – Calculator Reports Purchased From Engineering Express Read More »

FAQ I have a different size generator than those listed on a concrete pad master plan. How can that be added?

This would require the project to be site specific. Please visit EngineeringExpress.com/ExpressPass to apply for access to request a quote for a site-specific project. Click ‘apply for access’, fill the form and in the description box, please give us an idea of the project you are looking for. After submitting a team leader will contact …

FAQ I have a different size generator than those listed on a concrete pad master plan. How can that be added? Read More »

Scroll to Top